We are really proud of our latest project in Ortisei/Trentino-South Tyrol:
The expansion of the Hotel "Cavallino Bianco",awarded as the worlds´ best family hotel.
We have delivered more than 110 inlet valves mod. Majestic, over 250 PVC pipes where installed, with a overall length of 500m. Over 900m remote control wire and 140 deviations and over 600 45° street ells where mounted.
All of this has been realized in less than 14 days!