Rolex SA

Genf - Switzerland

Rolex SA

Application: Headquarter

  • Surface 41.000 m²
  • Operators 52
  • Inlet valves 592
  • Pipes 6.000 m

 

System: Central Vacuum System - EF125IE

The project

In 2004 the Rolex SA started building a new productive unite in the surrounding of Genève.

Completed in 2006 the building consists of 2 twin towers with 12 floors each.

On 41.000 m2 Disan installed 8 CVS model EF125i as well as one model CD125i for the Panorama-Restaurant.

Up to 52 operators are able to clean simultaneous using the 592 inlet valves (496 of those are on the floor and 96 are on the wall).

The inlet valves are connected with 6.000 meters of pipes.

 

 

Would you like to know more about our solutions?

Contact form

Do you need an offer or more information? Fill in the contact form and we will contact you as soon as possible.

WEITERE REFERENZEN

Das könnte Sie auch interessieren

REFERENCES

Application: International Theatre 

  • Surface 13.000 m²
  • Operators 18
  • Inlet valves 220
  • Pipes 1.650 m

 

Details
REFERENCES

Application: Primary school

  • Surface 5.000 m2
  • Operators 3
Details
ZURÜCK ZUR ÜBERSICHT